Skip to main content

Refine your search

Yleiskuvaa toimistolta.

Power has been restored in Aurora II building, repair continues in Aurora I building

The power outage caused by a transformer failure in the Aurora II building has been fixed on 25 July 2023 at 3 pm. However, the repair work continues in the Aurora I building on 26 July.

Some maintenance work was carried out in the Aurora buildings on 24 July and, due to a transformer failure, power couldn’t be restored after maintenance. As a result, the electronic doors of the buildings remained closed on 25 July, preventing the staff from entering the buildings.

The Aurora II building’s electrical network is expected to be restored to normal on 26 July 2023. Remote work is recommended for the staff working in the Aurora I building.